Feasibility Study
↓ DHB (district heating - biomass)
• DHB Cankova
- post office, restaurant and 5 residential houses
- Power 100 kW
• DHB Kuzma
- Heat pump use for heating and cooling
• DHB Cankova
- Church, parish house, community, home for the elderly, Primary school and 21 other users
- Power 700 kW
• DHB and passive cooling in City center Beltinci
- Lenght = 800 m
- Church, parish house, community, home for the elderly and 4 Residences
- Power 600 kW
↓ Industry, SPA, City's,...
• Electrical Lendava l.l.c. Electrical equipment industry
- Passive cooling in technology and facilities
• Rogaška Health l.l.c.
- The use of waste heat of thermal water and HP for heating domestic hot water,
- bathing waters, the mineral water's and heating facility. Cooling the building with a reversible function of heat pump.
• MURA l.l.c. Fashion industry
- Use of waste heat from flue gases.
- Implementation of high-pressure condensationheat for heating and cooling buildings with absorbent cooler.
- Passive cooling with ground water wells field.
- Use of HP water-water wells within the field.
• Terme Lendava Spa
- Implementation of thermal water cascaded
• Thermal City Lendava
- Measures to optimize the thermal water of different temperature levels with the possibility reinjection
• Business center Gonzaga
- Renewable energy and Alternative energy sources
- Area of 3678 m2
• GALEX, manufacture and marketing of pharmaceuticals
- Renewable energy and Alternative energy sources.
- Heat pump Water/Water with a reversible operation 2x70kW.
- Passive cooling.
- Ventilation with an absolute filtration.